Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 31, 2023

January 1, 2024

May 5, 2025

22560 SW Pine St

Paving, Site Work

No Information to Display

$18,100,000.00

Public - City

img_map_placeholder

22560 SW Pine St, Sherwood, OR

Subscribe to View Full Documents

Sealed bids for furnishing all materials, equipment, labor, and services for the construction of the Sherwood Hwy 99W Pedestrian Bridge Project (234ST Project Description The Work to be done under this Contract consists of the construction of the following items: 1. Structural steel bridge construction. 2. Concrete bridge foundations and associated shoring, cribbing and cofferdams. 3. Bridge deck concrete. 4. Pedestrian rails and handrails. 5. General Earthwork. 6. Relocation of underground public utilities. 7. Construct joint utility trench (~800LF) and coordination w/ franchise utility providers. 8. Construct new public storm conveyance systems. 9. Sewer mainline video inspection. 10. Portland cement concrete pavement placement (sidewalks, straight curb, curb & gutter, driveways) 11. Asphalt concrete pavement placement. 12. Electrical and other private utility infrastructure relocation. 13. Streetlighting and bridge illumination and control systems. 14. Video-surveillance system, conduit, boxes and appurtenances. 15. Erosion, Sediment and Runoff Control under a DEQ 1200-C permit. 16. Re-establishment of vegetated groundcover, landscaping, irrigation restoration. 17. Construction of new irrigation and controller. 18. Traffic control. 19. Work within city, county and ODOT jurisdictional roads (Sunset Blvd, 99W, Elwert/Kruger). All questions or requests for clarification must be submitted by EMAIL ONLY sent to ted.ketchum@kpff.com by 2:00 PM (PDT) on Tuesday, September 26, 2023, seven (7) days prior to bid opening to be logged and receive responses. All final responses will be posted via addendum in a question & answer log no later than three (3) days prior to Bid Opening. This is a local public works project subject to BOLI prevailing wages (ORS 279C.800 to ORS 279C.870). Bids shall be accompanied by a certified check, cashiers check or bid bond payable to the City of Sherwood in an amount equal to ten percent (10%) of the amount bid. The City of Sherwood may reject a bid that does not comply with prescribed public contracting procedures and requirements, including the requirement to demonstrate the bidders responsibility under ORS 279C.375(3)(b), and that the City may reject for good cause, all bids after finding that doing so is in the public interest. City reserves the right to waive minor informalities in any bid. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

72 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.