Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

April 1, 2025

December 1, 2026

To Be Determined

Site Work

No Information to Display

$5,026,900.00

Public - State/Provincial

img_map_placeholder

To Be Determined, Horicon, WI

Our team is requesting plans for this project.

Subscribe to View Full Documents

As of October 17, 2023, an engineer has been selected and this project is in the design phase. Although a firm timeline for construction has not been determined, construction is expected to start in April 2025 and end in December 2026. *The closed solicitation has been included below for reference: PROJECT DESCRIPTION: The project will provide long term structural stability of the lock chamber walls and floor of the Montello Dam Lock Chamber and continued ability to manipulate water levels. In addition to a sagging stacked stone wall, small sinkholes have been identified in the earthen embankment behind both lock walls. Complete reconstruction of the lock channel may be needed if the structural issues are significant enough to merit it. The stacked stone wall is historically significant; the selected firm will assist the DNR in historical coordination as appropriate. Additionally, State Highway 22 crosses over the lock chamber; coordination with WISDOT, other utility companies, and adjacent landowners is anticipated. PROJECT SCHEDULE: A/E Selection September 2023 Design Report April 2024 SBC Approval June 2024 Bid Opening February 2025 Construction Start April 2025 Substantial Completion December 2025 Project Closeout December 2026

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.