Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 28, 2023

October 30, 2023

January 28, 2024

Pinewood Dr

Paving, Site Work

No Information to Display

$541,175.00

Public - City

img_map_placeholder

Pinewood Dr, Carolina Shores, NC

Subscribe to View Full Documents

As of October 19,2023, project was awarded to Highland Paving Company, LLC, awarded amount is $541,174.75. Question Deadline 09/20/2023 at 5:00 PM ET These shall be directed to: Jackson D. Starling, PE East Coast Engineering, PC 4918 Main Street, PO Box 2469 Shallotte, NC 28459 Phone (910) 754-8029 Email: jstarling@eces.biz Individual inspection of the proposed construction site is allowed. Telephone or email the contact person noted below in order to notify of a visit. The Town of Carolina Shores ("Owner"), reserves the unqualified right to reject any and all proposals. A 5% bid bond or deposit is required. Various patches, leveling, installation of geosynthetic Hatelit mat, and a standard 2.0" overlay of Pinewood Drive & Myrtlewood Drive. Pinewood Drive contains 7,930 SY of Hatelit geosynthetic mat, and 16,233 SY of 2.0" SF 9.5B Asphalt overlay. Myrtlewood Drive contains 3,723 SY of Hatelit Geosynthetic mat, 90 SY of full depth patching, and 3,723 SY of 2.0" SF 9.5B Asphalt overlay. All asphalt overlays shall tie uniformly into existing driveway except where driveways have been installed high or low, as agreed by contractor and ECE inspector. All work shall adhere to the attached documents (standard specifications, general conditions, & plans). There are liquidated damages associated with this project. Liquidated damages will be in the amount of $250.00 per day for each calendar day beyond the completion date set from the Notice to Proceed. A performance bond and a payment bond will be required for one hundred percent (100%) of the contract price.

6 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.