Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 25, 2023

March 8, 2024

November 10, 2024

Multiple Locations

Paving, Site Work

No Information to Display

$500,000.00

Public - State/Provincial

img_map_placeholder

Multiple Locations, Berea, OH

Subscribe to View Full Documents

Bids will be received for this Project, which includes the following: Rehabilitation of Structure or Replacement of bridge decks, bridge deck joints, bearings; sealing of constructions joints; performing concrete weatherproofing; maintenance of traffic; and all other items incidental to the completion of work. All Work is to be performed as per the Plans, Drawings, Specifications, Special Provisions, Technical Specifications, and other Contract Documents for this Project. Project No. 43-23-05 Bridge Deck Replacement and Rehabilitation Spies-handy Corners Road (Tr 22) Over Ohio Turnpike M.p. 27.3 Hartman-inlet Road (Tr 17) Over Ohio Turnpike M.p. 32.2 Fulton County, Ohio. Prevailing Wage Rates and Equal Employment Opportunity requirements apply to this Project. Bidders should submit all questions no later than seven (7) days prior to Bid Opening. The Small Business Enterprise (DBE/EDGE/SBE) Goal applicable to this Project is 11%. A Contract will be awarded, if any award be made, to the Bidder determined to have submitted the lowest responsive and responsible Bid for the performance of the Work. The Commission reserves the right to reject any and all Bids and to waive minor irregularities or technical deficiencies. Rehabilitation of Structure or Replacement of bridge decks, bridge deck joints, bearings; sealing of constructions joints; performing concrete weatherproofing; maintenance of traffic; and all other items incidental to the completion of work. All Work is to be performed as per the Plans, Drawings, Specifications, Special Provisions, Technical Specifications, and other Contract Documents for this Project.

32 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects