Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 27, 2023

October 27, 2023

July 23, 2024

1565 Roberts Rd

Renovation

No Information to Display

$1,398,750.00

Public - County

img_map_placeholder

1565 Roberts Rd, Douglasville, GA

Subscribe to View Full Documents

The work to be performed shall include: 1. Aeration a. Installation of Owner furnished aeration equipment to replace existing aerators in the aeration basins (two mixers in each of two aeration basins). Equipment includes: aerators (motors, gear boxers, impellers), VFDs, control panel, DO meters and transmitters b. Modification of the existing Main Electrical Building to install HVAC equipment c. Replacement of all exposed conduit in the aeration basin area 2. Demolition of the following items a.Resurface and coat secondary existing secondary clarifier launders with epoxy-type coating 3. Testing and startup All work will be performed within Authority property. All anticipated rights of way and easements required for the Project have been obtained. All anticipated federal, state, and local permits required for the Project have been obtained. All prospective bidders must hold a current Georgia Utility Contractors License and be on, or promptly qualify for inclusion on, the Authority's Approved Contractor List, without restriction or probationary status All bids must be accompanied by adequate bid security (certified check, bid bond, or irrevocable letter of credit) drawn in favor of the Authority and in the amount of five percent (5%) of the total bid price, which shall be subject to forfeiture as liquidated damages in the event that the bid be accepted and the bidder fail to promptly enter into the proposed contract for performance of the Project with the Authority. The Authority further reserves the right to waive technicalities and informalities in the Invitation for Bids and bids submitted.

19 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects