Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 26, 2023

November 27, 2023

May 24, 2024

Multiple Locations

Paving, Site Work

No Information to Display

$999,813.00

Public - City

img_map_placeholder

Multiple Locations, Arlington Heights, IL

Subscribe to View Full Documents

As of October 27,2023 this project has not yet been awarded. The project is expected to be awarded on November 6, 2023. The above designated work and improvements referred to as Evergreen-Maude Storm Sewer Improvements shall include the installation of new public storm sewers and appurtenances at various locations within the Village of Arlington Heights. This work will include, but is not limited to, pavement removal; grading and shaping ditches; storm sewer installation of sizes between 8" and 18" of either PVC or RCP pipe; precast concrete box culvert installation; concrete sewer structure installation; bituminous pavement patching; driveway repair; milling and resurfacing of the streets. The locations for this work are shown in the Contract Documents. This work shall be to the requirements as indicated in the Contract Specifications. Bidders shall comply with the Grant requirements of the Illinois Department of Commerce & Economic Opportunity (DCEO) which has specific requirements toward Business Enterprise Program (BEP) Goals as enumerated in section 10 of the Special Conditions. Bidders shall comply with the Prevailing Wage Rate Act (820 ILCS 130/), the IDOT Standard Specifications for Road and Bridge Construction, adopted April 1, 2016, and the IDOT Supplemental Specifications and Recurring Special Provisions, adopted January 1, 2023. Bidders will also be required to comply with the applicable equal employment opportunity provisions. Bid bond, cashiers check, certified check drawn on a solvent bank in the State of Illinois, payable without condition to the Village of Arlington Heights in an amount not less than five percent (5%) of the bid, shall be submitted with each Proposal. This project shall include the installation of new public storm sewers and appurtenances at various locations within the Village of Arlington Heights. This work will include, but is not limited to, pavement removal; grading and shaping ditches; storm sewer installation of sizes between 8" and 18" of either PVC or RCP pipe; precast concrete box culvert installation; concrete sewer structure installation; bituminous pavement patching; driveway repair; milling and resurfacing of the streets.

13 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects