Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 19, 2023

November 20, 2023

No Information to Display

20 High School Rd

New Construction, Site Work

No Information to Display

$340,000.00

Public - County

img_map_placeholder

20 High School Rd, Campton, KY

Subscribe to View Full Documents

Wolfe County Board of Education (OWNER) will receive proposals through Codell Construction Company (CONSTRUCTION MANAGER) to furnish all labor and materials to complete the Construction of the Wolfe County Schools New Auxiliary Building (ESSER III) located at 20 High School Road, Campton, KY 41301. Work is to be performed in accordance with plans, specifications, and addenda prepared by RBS Design Group (ARCHITECT), Marcum Engineering (M/E ENGINEER), and Wilkie Structural Engineers (STRUCTURAL ENGINEERS). The project is partially funded by ESSER III grant funds, Federal prevailing wages required by the Davis-Bacon Act will be applicable, including weekly submittal of certified payroll reports. The Owner reserves the right to reject any or all bids and to waive all informalities and/or technicalities where the best interest of the Owner can be served. Bid opening will be public, and contracts will be with the Owner. Bids from Small Business Enterprises (SBE, MBE, WBE, VOSB, etc.) are encouraged and supported. Each bid must be accompanied by a 5% Bid Bond. The bid will be submitted in duplicate on copies of the Form of Proposal located in the Volume One Project Manual Bidding and Contract Documents. Both copies of the Form of Proposal and Bid Bond shall be placed in a manila envelope and have the Project Name and Proposed Bid Package number affixed. No Bidder may withdraw a bid submitted for a period of sixty (60) days after the date set for the opening of bids. If a bidder wishes to mail a bid, it should be mailed to: Kenny Bell, Superintendent, at 85 Main Street, Campton, KY 41301. If bid is mailed, it must be received prior to September 13, 2023 at 1:00 PM. Facsimile bids will NOT be allowed. Bids received after the deadline will not be opened. The Project Schedule will be issued via addendum. The contract will include liquidated damages assessed at $1,000.00/day if the completion date is not met. Successful Bidders are required to furnish a 100% Performance and Labor and Material Payment Bond for this Project. Question Deadline 09/20/2023

25 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects