Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

May 1, 2025

June 1, 2026

2420 Nicolet Dr

Renovation

No Information to Display

$4,980,000.00

Public - State/Provincial

img_map_placeholder

2420 Nicolet Dr, Green Bay, WI

Our team is requesting plans for this project.

Subscribe to View Full Documents

As of October 17, 2023, an architect has been selected and this project is in the design phase. Although a firm timeline for construction has not been determined, construction is expected to start in May 2025 and end in June 2026. *The closed solicitation has been included below for reference: UNIVERSITY OF WISCONSIN - GREEN BAY CAMPUS Project work includes removal and replacement of studio lighting, sound and technology equipment, and air handling unit AHU 2. Three corridor alcoves will be converted to in-studio materials storage. The instructional technology installed will raise each studio to technology Level 3 and provide instructors with cutting-edge audio and video technology from which to present their specialized curriculum. A new instructor station with integrated controls, electronically controlled projector and projection screen, and audio/video systems will be installed in each studio. New studio lighting will provide improved ambient lighting and controls as well as new specialized task lighting to better capture and understand the role light plays the creation and perception of 2D and 3D art pieces. Ventilation and exhaust will also be improved to provide a healthier learning environment by reducing the fumes from paints and solvents and improved drying environment for in-progress and finished pieces. New studio casework and sinks will be provided in in all but the drawing studio. Stationary wall systems will be provided in the painting studios to reduce distractions for the artists. New window treatments will also be installed to improve room darkening performance and natural light control. Project Schedule: Start Project: May 2025 Substantial Completion: Dec 2025 Project Close Out: Jun 2026

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects