Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 15, 2023

October 16, 2023

No Information to Display

Multiple Locations

Site Work

No Information to Display

$830,655.00

Public - County

img_map_placeholder

Multiple Locations, Lakewood, WA

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

All materials and labor necessary to replace bus passenger shelters per the plans and specifications, including but not limited to, sourcing new shelters, removal of old shelters and installation of new shelters. Pierce Transit currently has approximately five hundred (500) bus stops with shelters. Many of them are approaching twenty (20) years old and need to be replaced. The initial amount to be replaced is anticipated to be forty-five (45) shelters. The Contractor will have the latitude to determine the sequence of the replacements, with Pierce Transit's prior approval. Contractor and Pierce Transit will need to coordinate bus stop closures and/or relocations to allow Pierce Transit to make the appropriate accommodations. Future replacement quantities and timing will be based upon the availability of funding over the next several years. Federal clauses are included in the project documents if grant funding becomes available. As such, the work is structured in a phased approach as Pierce Transit anticipates removal and installation of the initial forty-five (45) shelters with the option of adding additional shelters in the future. The Engineer's Estimate is $895,000 to $940,000. Each bid must be accompanied by a Certified Check or Bid Bond in an amount equal to five (5) percent of the Bid A pre-bid conference and site visit will not be scheduled *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Pierce Transit reserves the right to reject any and all bids, waive technicalities or irregularities and to accept any bid if such action is believed to be for the best interest of Pierce Transit.

5 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.