Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 14, 2023

October 13, 2023

May 15, 2024

1000 Florence Wy

Site Work

No Information to Display

$686,885.00

Public - City

img_map_placeholder

1000 Florence Wy, West Wendover, NV

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

Pursuant to an order of the Board of Trustees of the West Wendover Recreation District, County of Elko, State of Nevada, made at the regular meeting of said Board on the 10th day of August, 2023, said Board authorized the purchase and application of swimming pool plaster as follows: Furnish all labor, materials, equipment, cleanup, and performance of all operations for the re-plastering of the West Wendover Recreation District swimming pool located at 1000 West Florence Way, West Wendover, Nevada. Work shall include, but not be limited to: All interior surfaces to receive new plaster shall be chipped, cut and/or sandblasted to original concrete and cleaned of projections, dust, loose particles, grease, bond breakers and foreign matter and sufficiently roughened to provide a mechanical bond up to all racing lanes, targets, inlets, stairs, eyes and drain gates. All debris removed during prep and plaster process shall be removed from the job site. Install a minimum of 3/8 inch thick white pool plaster mix to all interior pool surfaces to include all necessary bonding agents to ensure proper bonding of new plaster, and troweling of plaster to a smooth, hard, impervious finish. Plaster shall be sufficiently thick to hold water and a maintainable surface. The installer must follow or exceed all pool plasterer s minimum guidelines found within the National Plasters Council Technical Manual. Bid should include a five (5) year warranty on materials and workmanship. Re-plastering of the pool shall be completed no later than May 15, 2024. All bidders are invited and encouraged to inspect and measure the swimming pool prior to submitting bids. Please contact Joey Hendriks at (775) 664-3289 for detailed material specifications and pool dimensions. The right is reserved by the Board of Trustees of the West Wendover Recreation District to reject any and all bids or to accept such bid as deemed by said Board and to wave any technicality in the form of the bid. By order of the Board of Trustees of the West Wendover Recreation District, County of Elko, State of Nevada.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.