Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 21, 2023

October 27, 2023

February 20, 2024

1107 Martin Luther King Jr Blvd

Site Work

No Information to Display

$60,000.00

Public - County

img_map_placeholder

1107 Martin Luther King Jr Blvd, Green Cove Springs, FL

Subscribe to View Full Documents

As of 10/26/23, per Owner, the Board rendered its decision to reject the bid received. The Clay County Board of County Commissioners are requesting Bids from licensed Contractors to complete site preparation, demolition, pond drainage development and the construction of six (6) pickleball courts at Green Cove Springs Augusta Savage Arts & Community Center at 415 Lemon St, Green Cove Springs, FL 32043 (City of Green Cove Springs). This is a joint project between Clay County Board of Commissioners and the City of Green Cove Springs. The point of contact for this project after award will be the Clay County Facilities Program Manager for Clay County Board of County Commissioners (BOCC). Work includes, but is not limited to obtaining and providing all materials, labor, inspections and equipment necessary to complete the project in accordance with the construction plans and the following: Mobilization, site preparation, safety measures, erosion & sediment control, and all incidental work needed to complete the construction of the pickleball court project. Demolition of as described in the plans. Install drainage components and connect to the current infrastructure. Construct six (6) new pickleball courts and retention pond per the design specifications. Install all components to facilitate future lighting. The Contractor must abide by all documented requirements and general notes as listed in the construction plans. Question Deadline 09/12/2023 at 4:00 PM ET Substantial Completion must be accomplished by ninety (90) days from Notice to Proceed. Final Acceptance must be accomplished by one hundred and twenty (120) days from Notice to Proceed. Liquidated Damages The Contractor shall be assessed Liquidated Damages (LD) of $100.00 for each day past final completion date set by the contract.

16 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects