Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
October 25, 2023
November 4, 2023
September 13, 2029
FL-8
Demolition, New Construction, Paving, Site Work
No Information to Display
$216,916,955.00
Public - State/Provincial
FL-8, Milton, FL
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Counties: Escambia Road Name: SR 8 (I-10) Limits: At Sr 95 (Us 29) Interchange Project(s): 22247615201(*) Federal Aid No: D322015B Project(s): 22247615604(*) Federal Aid No: D322015B Project(s): 22247615607(*) Federal Aid No: D322015B Total Roadway Length: 2.080 Miles Contract Days: 2140 Total Bridge Length: 0.111 Miles Total Proposal Length: 2.191 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 15 days Description: The Improvements Under This Contract Consist of Major Roadway Improvements on Sr 8 (I-10) @ Sr95 (Us 29) Interchange in Escambia County from Mp 8.898 to Mp 11.634 Including Realignment and Widening to Add Lanes, Removal of One Existing Roadway Bridge (480057), Cleaning and Coating of Three Existing Roadway Bridges (480055, 480056, & 480065) With Additional Traffic Railing on Bridge 480055, Construction of Eight New Roadway Bridges (480279, 480280, 480281, 480282, 480283, 480284, 480285, & 480286), Removal of the Existing Csx Railroad Bridge (480058), Construction of Two New Csx Railroad Bridges (480287 & 480291), Interchange Improvements, and Lane Modifications at Us 29 (Sr 95). Work Includes Stormwater Systems, Stormwater Ponds, Signalization, Sidewalks, Noise Walls, Lighting, Signing & Pavement Markings, and Its. The Preceding Work Will Be Included Under Fpid222476-1-52-01. Utility Work by Highway Contractor Will Include Water Main Relocation for Ecua (Fpid 222476-1-56-04) and Gas Main Relocation for Pensacola Energy (Fpid 222476-1-56-07). For Projects in Excess of $50 Million, in Addition to Meeting All Other Qualification Requirements of Section 337.14, Florida Statutes, And Rule Chapter 14-22, Florida Administrative Code, Any Contractor Who is Not Prequalified and in Good Standing With the Department as of January 1, 2019, Must Submit Evidence Which Demonstrates Satisfactory Completion of at Least Two Projects, Each in Excess of $15 Million, for the Florida Department of Transportation or for Any Other State Department of Transportation. Acceptability of the Evidence Related to the Two Projects is at the Sole Discretion of the Department. There Will Be a Mandatory Pre-bid Meeting for This Project at 10:00 AM Cst. on Friday, September 8, 2023 At the Florida Department of Transportation, Milton Operations Center Auditorium6025 Old Bagdad , Highway, Milton, Fl 32583. If You Have Any Questions Concerning This Matter, Please Contact Eric Saggars at (850) 849-3278. } This Pre-bid Meeting is Mandatory Because of the Complexity of the Project. Only Plans and Specifications Will Be Available Prior to the Pre-bid Meeting. The Prospective Bidder Shall Be Prequalified According to the Requirements of Fdot Rule Chapter 14-22 and Section 2-1 of the 2019 Standard Specifications for Road and Bridge Construction. Proposals (Bidding Documents) Will Be Issued Only to the Prospective Bidders Who Have Attended the Pre-bid Meeting and Met the Florida Department of Transportation Qualifications for This Project. Prospective Bidders Ordering Bid Documents Prior to the Pre-bid Meeting Will Be Given Access to Download the Bid Documents Within 24 Hours After the Pre-bid Meeting. Those Prospective Bidders Ordering the Documents After the Pre-bid Meeting Will Need to Contact the Office Advertising the Project to Confirm Attendance and Receive Access to Download the Bid Documents. Please Contact the Office at Least Two Working Days Prior to the Deadline for Obtaining Bid Documents to Allow Time for Processing. Question Deadline 10/18/2023 at 5:00 PM Questions posted to this site will be responded to by the Department. For questions posted after this time, an answer cannot be assured. For all questions posted before the deadline, FDOT will provide and post responses on online. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order 001: Interchange - Add Lanes / Bridge Construction / Milling and Resurfacing / Drainage Improvements - SR 8
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Milton, FL
Bid Date: Oct 25 2023
Milton, FL
Bid Date: Nov 20 2023
Milton, FL
Bid Date: Nov 28 2023
Milton, FL
Bid Date: Oct 12 2023
Milton, FL
Bid Date: May 18 2022
Milton, FL
Bid Date: Oct 19 2023
Milton, FL
Bid Date: Jan 11 2024
Milton, FL
--
Milton, FL
Bid Date: Sep 27 2023
Milton, FL
Bid Date: Jul 24 2023
Milton, FL
Bid Date: Aug 28 2023
Milton, FL
Bid Date: Aug 21 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
