Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 21, 2023

November 2, 2023

November 28, 2023

Visitacion Ave

Paving, Site Work

No Information to Display

$245,000.00

Public - City

img_map_placeholder

Visitacion Ave, Brisbane, CA

Subscribe to View Full Documents

As shown in the 2023 LOWER VISITACION AVE. OVERLAY PROJECT plans and required by these specifications and special provisions, this project includes, but is not limited to, furnishing all labor, materials and equipment necessary for cold planing asphalt concrete (AC) pavement, AC overlay, replacing thermoplastic traffic striping, and adjusting utility frames and covers to grade. The work is to include all striping, street sweeping and traffic control. The project is to be performed in accordance with and as described and provided in the Plans and Specifications therefore and the proposed form of contract thereof, all of which are on file in the Office of the Director of Public Works and the City Clerk of the said City, and to which special reference is hereby made and which are made a part hereof. Bid questions will be due in writing to 50 Park Place Brisbane, CA 94005, emailed to Tomas Santoyo at tsantoyo@brisbaneca.org, or faxed to 415-467-5547 by September 11, 2023 at 12 p.m. Each bid must be accompanied by a Proposal Guarantee amounting to no less than ten percent (10%) of the bid as described in the bid specifications. Said guarantee shall be forfeited to the City in case the bidder depositing the same does not enter into a contract within 10 days after written notice that the contract has been awarded to him. At the time of contract execution, the Contractor shall provide proof of insurance as required in the contract and a surety bond for faithful performance of the specified work in an amount equal to at least one hundred percent (100%) of the contract price. The contractor shall also provide at the time of contract a surety bond for labor and material in an amount equal to at least one hundred percent (100%) of the contract price. All bonds shall be submitted on the bond forms contained in the specifications. The City of Brisbane reserves the right to reject any or all bids, or any part of any bid. Engineer's Estimate: $197,350

13 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.