Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 27, 2023

October 7, 2023

April 14, 2024

FL-20

Paving, Site Work

No Information to Display

$2,142,434.00

Public - State/Provincial

img_map_placeholder

FL-20, Hosford, FL

Subscribe to View Full Documents

Counties: Liberty Road Name: SR 20 Limits: From E of Apalachicola River Bridge to E of Nw Revell Rd Project(s): 43626225201(*) Federal Aid No: D323045B Project(s): 43626225203(*) Federal Aid No: N/A Total Roadway Length: 1.144 Miles Contract Days: 190 Total Bridge Length: 0.000 Miles Total Proposal Length: 1.144 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 60 days Description: The Improvements under this Contract consist of milling and resurfacing of SR 20 from E of Apalachicola River Bridge to E of NW Revell Road in Liberty County under FPID 436262- 2-52-01. Other improvements under this project include sidewalk replacement, drainage improvements, curb and gutter, signing and pavement markings, signalization, and lighting. FPID 436262- 2-52-03 includes utility manhole adjustments. Question Deadline 9/20/2023 at 5:00 PM Questions posted to this site will be responded to by the Department. For questions posted after this time, an answer cannot be assured. For all questions posted before the deadline, FDOT will provide and post responses on online. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order 010: Resurfacing / Lighting / Traffic Signals - SR 20

21 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.