Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 8, 2023

April 13, 2024

No Information to Display

Multiple Locations

Paving, Site Work

No Information to Display

$487,000.00

Public - City

img_map_placeholder

Multiple Locations, Cleveland, OH

Subscribe to View Full Documents

**As of October 13, 2023, Cleveland Metroparks will not be making an award for this bid due to the lowest and best bid was over the estimated budget by more than 10%. Cleveland Metroparks will be rebidding this project in the near future..** 1. Sawcutting and removal of 14,850 sf of parking lot paving and aggregate base and one parking lot light with foundation. 2. Excavation and construction of8,640 sf of vegetated bioswales. 3. Installation of 575 lineal feet of 6 underdrain and 5 precast outlet structures. 4. Outlet pipe bulkheading and adjustment of rim grades on 4 existing catch basins. 5. Rerouting of 365 lineal feet of 2 electrical conduit and installation of8 new fiberglass hand holes. 6. Replacement of 40 lineal feet of 24 HDPE storm sewer pipe and associated steel casing 7. Construction of 150 lineal feet of poured concrete storm water containment wall with split face form pattern. 8. Removal and replacement of540 square feet of8 thick concrete pad and aggregate base 9. 1-1/2 surface course grind and overlay of 13,440 square yards of existing asphalt parking lot and drive pavement. 10. Parking lot and drive pavement markings and all disturbed traffic loops restored in-kind. 11. Topsoil and sod placement on 6,235 sfofvegetative islands. 12. Straw waddles, screen barriers, and any other storm water pollution prevention measures. Written questions must be submitted via by Friday, September 1, 2023 by 3:00 p.m. (EST)

14 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.