September 20, 2023
October 20, 2023
No Information to Display
I-476
Demolition, New Construction, Paving, Site Work
No Information to Display
$15,727,893.00
Public - State/Provincial
I-476, City of Wilkes Barre, PA
**As of October 26, 2023, project was awarded to H&K Group, Inc. awarded amount is $15,727,892.81. ** This project provides for the furnishing of all labor, material, equipment and work necessary for the replacement of two structures over I-476, NB-637 on SR 2007 (Laurel Run Road) and NB-638 on Ramp AB of the Wilkes-Barre Interchange. The existing SR 2007 structure (NB-637) is a steel thru-plate girder bridge and will be replaced by a two-span continuous spread box beam bridge. The existing Ramp AB structure (NB638) is a three-span steel I-beam bridge and will be replaced by a two-span continuous composite steel plate girder bridge. The project also includes slope repair, roadway resurfacing, drainage improvements, postconstruction stormwater controls, guide rail upgrades, minor roadway approach work and Maintenance and Protection of Traffic. 18,558 CY Excavation, Various Classes 14,460 CY Waste Material 1,837 TON Superpave Wearing Course, Various Types and Depths 2,839 TON Superpave Binder Course, Various Types and Depths 1,299 TON Superpave Base Course, Various Types and Depths 2,814 TON Subbase No 2A, Various Depths 7,081 CY Selected Borrow Exc. Structure Backfill 941 LF Drainage Pipe, Various Types and Sizes 1,538 LF Pavement Base Drain 1,687.5 LF Type 31-S Guide Rail 1,374 CY Class A Cement Concrete 858 LF Prestressed Concrete Beams 322,404 LB Reinforcement Bars, Epoxy Coated 3,984 LF Steel Beam Bearing Piles, 12 x 74 277,062 LB Fabricated Structural Steel An electronic bid bond, from an approved vendor, with corporate surety, in the amount of five (5%) percent of the bid must be submitted with the proposal as bid security. The bid security of the three (3) low bidders will be retained until the execution of the contract. (The normal time for execution of the contract is approximately four [4] weeks.)
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
City of Wilkes Barre, PA
Bid Date: Oct 12 2023
City of Wilkes Barre, PA
Bid Date: Oct 16 2023
City of Wilkes Barre, PA
Bid Date: Oct 19 2023
City of Wilkes Barre, PA
Bid Date: Feb 01 2024
City of Wilkes Barre, PA
Bid Date: Sep 19 2024
City of Wilkes Barre, PA
Bid Date: Nov 07 2023
City of Wilkes Barre, PA
Bid Date: Oct 17 2023
Concord Township, PA
Bid Date: Nov 03 2023
East Lansdowne, PA
Bid Date: Nov 17 2023
Philadelphia, PA
--
Pittsburgh, PA
--
Lititz, PA
Bid Date: Nov 02 2023
Womelsdorf, PA
Bid Date: Dec 16 2025
Havertown, PA
Bid Date: Oct 26 2023
Pittsburgh, PA
Bid Date: Nov 15 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.