Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 20, 2023

October 20, 2023

No Information to Display

I-476

Demolition, New Construction, Paving, Site Work

No Information to Display

$15,727,893.00

Public - State/Provincial

img_map_placeholder

I-476, City of Wilkes Barre, PA

Subscribe to View Full Documents

**As of October 26, 2023, project was awarded to H&K Group, Inc. awarded amount is $15,727,892.81. ** This project provides for the furnishing of all labor, material, equipment and work necessary for the replacement of two structures over I-476, NB-637 on SR 2007 (Laurel Run Road) and NB-638 on Ramp AB of the Wilkes-Barre Interchange. The existing SR 2007 structure (NB-637) is a steel thru-plate girder bridge and will be replaced by a two-span continuous spread box beam bridge. The existing Ramp AB structure (NB638) is a three-span steel I-beam bridge and will be replaced by a two-span continuous composite steel plate girder bridge. The project also includes slope repair, roadway resurfacing, drainage improvements, postconstruction stormwater controls, guide rail upgrades, minor roadway approach work and Maintenance and Protection of Traffic. 18,558 CY Excavation, Various Classes 14,460 CY Waste Material 1,837 TON Superpave Wearing Course, Various Types and Depths 2,839 TON Superpave Binder Course, Various Types and Depths 1,299 TON Superpave Base Course, Various Types and Depths 2,814 TON Subbase No 2A, Various Depths 7,081 CY Selected Borrow Exc. Structure Backfill 941 LF Drainage Pipe, Various Types and Sizes 1,538 LF Pavement Base Drain 1,687.5 LF Type 31-S Guide Rail 1,374 CY Class A Cement Concrete 858 LF Prestressed Concrete Beams 322,404 LB Reinforcement Bars, Epoxy Coated 3,984 LF Steel Beam Bearing Piles, 12 x 74 277,062 LB Fabricated Structural Steel An electronic bid bond, from an approved vendor, with corporate surety, in the amount of five (5%) percent of the bid must be submitted with the proposal as bid security. The bid security of the three (3) low bidders will be retained until the execution of the contract. (The normal time for execution of the contract is approximately four [4] weeks.)

26 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects