Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 13, 2023

October 13, 2023

November 24, 2023

89 Airport Rd

Renovation, Site Work

No Information to Display

$600,000.00

Public - County

img_map_placeholder

89 Airport Rd, Glasgow, MT

Subscribe to View Full Documents

**As of October 19, 2023, this project has not yet been awarded. A timeline for award has not yet been established.** Glasgow Airport (GGW) Wokal Field Airport Electrical Vault Installation Project Bid security shall be furnished in accordance with the Instructions to Bidders within the bid documents, and require each Bid to be accompanied by a Certified Check, Cashiers Check, or Bid Bond payable to Valley County, in an amount not less than ten percent (10%) of the total amount of the Bid. Successful Bidders shall furnish an approved Performance Bond and a Labor and Materials Payment Bond, each in the amount of one hundred percent (100%) of the Contract amount. Insurance as required shall be provided by the successful Bidder(s) and a Certificate(s) of that insurance shall be provided, as stipulated within the Bid documents. Glasgow, MT. The Electrical Vault Installation Project includes the following work elements: o Site preparation and Installation of a new pre-cast electrical vault o Removal, relocation, installation and connection of new & existing airfield electrical utilities 1. The Offeror's or Bidder's attention is called to the "Equal Opportunity Clause" and the "Standard Federal Equal Employment Opportunity Construction Contract Specifications" set forth herein. 2. The goals and timetables for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows: Timetables Goals for minority participation for each trade: 4.1% Goals for female participation in each trade: 6.9% No pre-bid conference will be held for this project; however, potential bidders are encouraged to visit AE Plans and contact the Project Manager THE OWNER RESERVES the right to reject any or all bids received, to waive informalities, to postpone the award of the contract for a period not to exceed sixty (60) days, to evaluate bids submitted and to accept the lowest responsive and responsible bid which is in the best interest of the Owner.

7 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.