Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 21, 2023

April 15, 2024

No Information to Display

To Be Determined

Paving, Site Work

No Information to Display

$1,823,800.00

Public - City

img_map_placeholder

To Be Determined, Springfield, MA

Subscribe to View Full Documents

All bids have been rejected. All questions must be made in writing to theo.theocles@waterandsewer.org by 9/6/23 @ 4:30 P.M. in order to be considered. Provin Mountain Reservoir 3 and 4 Improvements. Extension of 34 access manholes with watertight locking hatches, installation of polyolefin waterproofing tape and epoxy adhesive on approximately 5,000 linear feet of buried storage tank roof slab joint, including excavation and restoration. Installation of chain link fencing, installation of flanged ductile iron piping and bends with concrete bulkheads, concrete cradles, concrete splash pads, bituminous pavement, and stainless-steel mesh screens on two existing overflow pipe headwalls, loam and seed of disturbed areas.

14 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects