Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 20, 2023

November 20, 2023

No Information to Display

201 N 2nd St

Renovation

No Information to Display

$269,000.00

Public - County

img_map_placeholder

201 N 2nd St, Saint Charles, MO

Subscribe to View Full Documents

A. Provide seismic restraints as indicated for each type of equipment and for piping systems. This section applies to Fire Protection Systems. B. Scope of work Flexible pipe connectors are specified in the appropriate piping section of these specifications Seismic control manufacturer shall have the following responsibilities Determine seismic restraint sizes and locations Provide piping and equipment seismic restraints as scheduled or specified. Provide installation instructions and drawings Provide calculations to determine restraint loads resulting from seismic forces in accordance with the Local Building Code (see below), governing codes, and project seismic requirements. Seismic calculations shall be certified by a licensed engineer, experienced in the design of restraints for flexibly mounted equipment. 3. Friction from gravity loads shall not be considered resistance to seismic forces 4. All piping shall to be restrained per NFPA 13. At a minimum, the seismic restraint manufacturer shall provide documentation on maximum restraint spacing for various cable sizes and anchors, as well as 'worst case' reaction loads at restraint locations. The scope of the work is described in the Bid Specifications and Contract Documents, including without limitation the Bid Form, which are incorporated herein by this reference. Administration Building Data Center UPS Upgrade Bid All questions must be received no later than 2:00 PM on 10/13/2023. St. Charles County has the right to accept and/or reject any and all bids.

12 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects