Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 27, 2023

October 23, 2023

September 27, 2024

Multiple Locations

Site Work

No Information to Display

$389,546.00

Public - City

img_map_placeholder

Multiple Locations, Whitefish, ON

Subscribe to View Full Documents

Town of Collingwood to prospective Bidders to submit Bids for the provision of the Hen and Chickens Island Bridge replacement The following is a general description of work to be constructed under the Contract: - remove and salvage existing steel truss; - install piers, abutment and pre-fabricated steel truss bridge; - reinstate connection to northerly boardwalk - restoration to existing conditions or better. Start work is set for October 23, 2023 Site work planned for July 15 to September 15, 2024 Substantial performance by September 27, 2024

73 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.