Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 3, 2023

January 5, 2024

April 16, 2025

To Be Determined

Site Work

No Information to Display

$12,500,000.00

Public - City

img_map_placeholder

To Be Determined, San Antonio, TX

Subscribe to View Full Documents

As of 10/17/2023, this project has not yet been awarded. Award details will be made available following November SAWS Board meeting. 22-1597, 00210901531 The Project consists of approximately 3,385 feet of 15 inch main and 3,000 feet of 18 inch main connecting to 5,350 feet of central 24 inch main, ultimately connecting to a lift station followed by SAWS Sewer Treatment Facility. The lift station will involve a 15-foottall lattice communication tower, a 30 to 35 foot deep wet well, precast valve vaults and an electric shelter. The purpose of our study was to explore subsurface conditions at the project site and, using the information obtained, develop recommendations to guide the design and construction of the proposed lift station and sewer line. TTL understands that shallow foundations will be used to support the communication tower (antenna foundation), precast valve vaults and electric shelters. Locations for 12 borings were initially proposed for this project. Three (3) of these locations, including B-1, B-11, and B-12, were not accessible at the time of drilling operations. The boring B-1 was inaccessible due to slope complications and borings B-11 and B-12 were inaccessible due to being located within the Southside ISD Right of Way. This report includes final recommendations for the lift station and preliminary recommendations for the sewer line. The three (3) boring locations that have not been drilled will be drilled at a later date. Sealed proposals are requested by the San Antonio Water System for the construction of a lift station and associated force main for the Ruby Crossing Offsite Sewer Phase 2 (Lift Station). For questions regarding this solicitation, technical questions or additional information, please contact Janie M. Powell, Contract Administrator, in writing via email at Janie.Powell@saws.org or by fax to (210) 233-5351 until 4:00 PM (CDT) on September 8, 2023. Answers to the questions will be posted to the web site by 5:00 PM (CDT) on September 15, 2023 as a separate document or included as part of an addendum. Be advised that firms responding to this RFCSP (Respondents) are prohibited from communicating with any other SAWS staff, the Consultant, the Developer, or COSA officials regarding this RFCSP up until the contract is awarded as outlined in the Instructions to Respondents. Electronic proposals shall be accompanied by a bid bond in an amount not less than five percent of the total proposal price. (Or, if providing SAWS with a cashier's check or certified check in an amount not less than five percent of the total proposal price, SAWS will request this within 24 hours from the Respondent who did not submit a bid bond).

122 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.