Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 8, 2023

December 8, 2023

No Information to Display

To Be Determined

Renovation

No Information to Display

$1,338,000.00

Public - State/Provincial

img_map_placeholder

To Be Determined, Detroit, MI

Subscribe to View Full Documents

Contractor should have participated in 3 projects within the last ten years showing demonstrable detailed experience comparable to the scope of Work specifically described for this solicitation. GLWA requests bids from construction companies (“Contractor”) to complete the Freud Pump Station Improvements as summarized in the “Scope of Work” section in accordance with the Specifications and Plans. The Project focuses on improving the operability, reliability, integrity, and maintainability of the station over the life of the facility. The Work includes rehab of the eight storm water pumps, including replacement of the pump rotating assembly, line shafts, and concrete pump supports, installing new dewatering pumps inside the Freud Storm Pump Station with an approximate 10.8 MGD firm capacity, providing dedicated access to the Freud Storm Pump Station wet well, and construction of a new Freud Sanitary Pump Station approximately 1.5 blocks east of the existing storm pump station. The sanitary pump station will be constructed over the two 16-ft diameter tunnels that convey flow to the existing Freud Storm Pump Station. The structure includes provisions to add stop logs in the two 16-ft tunnels to isolate Freud Storm Pump Station. The proposed structure will include a sanitary pump station with a firm capacity of 30 million gallons per day to manage dry weather flows. Submersible sanitary pumps will discharge to a proposed 36-inch force main on Navaho Street connecting to the 9-ft diameter Detroit River Interceptor on East Jefferson. WAGES: See Bonfire

63 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects