Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 26, 2023

January 2, 2024

No Information to Display

To Be Determined

New Construction

No Information to Display

$1,000,000.00

Public - City

img_map_placeholder

To Be Determined, Fallbrook, CA

Our team is requesting plans for this project.

Subscribe to View Full Documents

Scope of work to include: design and construction of a new fire station that is to be built next to, and on the same parcel as, the existing station; the existing station will be used as interim housing during construction of the new station and demolished after completion and Owner Occupancy of the new station. In accordance with the provisions of the California Public Contract Code Sections 22160-22169, the Fire District is utilizing a two-step process to prequalify, select and award contracts to Design-Build Entities (D-BEs) for this project. The District will use the Progressive Design-Build delivery method and deliver this project in two distinct phases, 1) design/pre-construction and 2) construction. The issuance of the RFSQ along with the Prequalification Questionnaire is the first step in the process. The D-BE’s with the highest ranking scores will be placed on the District’s Design Build Fire Station List and be eligible to advance to the second step in the process, which includes the issuance of Design-Build Request for Proposals (RFP). All project related questions and requests for clarifications, changes, exceptions, and deviations to the terms and conditions set forth in this solicitation shall be emailed to the Construction Manager, Brandon Hamlett at BHamlett@ericksonhall.com

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects