Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 6, 2023

October 6, 2023

October 21, 2023

8372 Buttress Ln

Site Work

No Information to Display

$240,000.00

Public - City

img_map_placeholder

8372 Buttress Ln, Manassas, VA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

The City of Manassas is soliciting Bids for a contractor to perform 24/40MVA, 230-13.2KV Transformer - HV and LV Bushings and HV Arresters Replacement at the Battery Heights Substation. The period of the Contract shall be for fifteen (15) days from the issuance of the Notice to Proceed. The Notice to Proceed will be issued within ten (10) days from the bid opening. 1. Perform pre-work external inspection of the transformer. 2. Perform pre-work electrical testing consisting of: Doble Power Factor (Windings, Bushings and Arresters), Doble Excitation in as-found DETC tap position, TTR in as-found DETC tap position, Insulation resistance (Windings and core), and Winding Resistance in as-found DETC tap position. 3. Perform pre-work oil tests consisting of Liquid Screen, Moisture and Dissolved Gas Analysis. 4. Drain 4907 gallons of oil from the transformer into supplied tanker. Oil will be followed down with dry air. 5. Continuous purge with dry air. Perform internal inspection. 6. Replace the 3 Qty 230KV HV and 4 Qty 25KV LV bushings. Contractor will provide the new HV and LV bushings and new gaskets. Contractor will provide soldering of the new HV draw lead connectors, if required. 7. Replace the 230KV HV station class arresters. Contractor will provide the new arresters. 8. Install new gaskets on all manhole covers. 9. Pressurize transformer at 5-7 psi and perform leak checks of the transformer. 10. Perform Dew Point Test.

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.