Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 21, 2023

November 20, 2023

June 17, 2024

Multiple Locations

Paving, Site Work

No Information to Display

$5,900,000.00

Public - City

img_map_placeholder

Multiple Locations, El Paso, TX

Subscribe to View Full Documents

The work under this contract shall be for furnishing all labor, materials, transportation, and services for the construction and installation of the following work: Excavate/reshape Arroyo 1 channel over approximately 1700 linear feet, comprising a new cut/fill of 30,100 CY. Install mortared rock rip-rap, gravel-filled soil stabilization system, articulated blocks, gabion mattress along the channel, and construct seven gabion basket weir drop structures. Construct a gravel-filled system maintenance access roadway for approximately 1900 linear feet. Each Bid shall be submitted in accordance with the Instructions to Bidders and be accompanied by a Bid Security in the amount of five percent of the amount bid. The Successful Bidder states he or she must furnish a 100 percent (100%) Performance Bond and a 100 percent (100%) Payment Bond, in accordance with the Instructions to Bidders and the General Conditions. Wages paid on this project shall be not less than the minimum prevailing wage rates listed in the Contract Documents, Section 00840, General Wage Requirements. Questions Deadline: September 11, 2023 by COB Answers Posted: September 15, 2023 by COB Questions can be sent to: purchasing.info@epwater.org Engineer Estimate: $4,830,209.78 - $5,501,072.24 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The utility's minimum goals for this project are: 25% FOR SMALL LOCALLY-OWNED BUSINESSES 10% FOR MINORITY-OWNED BUSINESSES 7% FOR WOMEN-OWNED BUSINESSES

6 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.