Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 26, 2023

October 26, 2023

January 5, 2024

To Be Determined

Renovation

No Information to Display

$226,200.00

Public - State/Provincial

img_map_placeholder

To Be Determined, Green Bay, WI

Subscribe to View Full Documents

In general, the work consists of: Replace the existing boiler feedwater treatment equipment. Specific new equipment to include water softeners, reverse osmosis system, and carbon filters. All associated pumps, piping and valves will be replaced. Winter heating loads have been reviewed to properly size the new RO system. The existing central water softeners and dealkalizers to pretreat the boiler make up water at UW Green Bay shall be removed.

6 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects