Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 3, 2023

October 18, 2023

No Information to Display

Devonshire Dr

Site Work

No Information to Display

$2,388,736.00

Public - City

img_map_placeholder

Devonshire Dr, Park Forest Village, PA

Subscribe to View Full Documents

The project area includes the lands owned by Ferguson Township known as the Park Hills Drainageway that starts along Devonshire Drive and proceeds southeast toward Circleville Road in State College, PA. The project includes tree clearing/removal, earthwork, streambed stabilization using regenerative storm conveyance methods of step pools and riffles constructed of rock, drainage pipe and inlet installation, seeding, and other associated work. All bidders must demonstrate experience with similar streambed restoration projects to be considered qualified for the project. The project is subject to minimum prevailing wage rates

12 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.