Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 21, 2023

October 9, 2023

June 30, 2024

Multiple Locations

Outdoor Lighting, Paving, Site Work

No Information to Display

$2,277,600.00

Public - City

img_map_placeholder

Multiple Locations, Sacramento, CA

Subscribe to View Full Documents

The Jack Sheldon Park & Florin Creek Trail Improvements Project scope of work includes renovation of an existing 13.4-acre park including the demolition and removal of existing site features and furnishings including, but not limited to, concrete and various site paving, tennis courts, court lighting and equipment, bike path, and trees/shrubs. Once demolition is completed, the improvements as shown on the plans will include, but not be limited to, grading, drainage, irrigation, landscaping, concrete walkways, addition of ADA parking stalls, decomposed granite, concrete mow curbs, site furnishings including trash receptacles, picnic tables, and benches, replacement of existing drinking fountain, renovated tennis court including paving and fencing, refurbishment of existing bleachers, renovation of the bicycle path including paving, relocation of existing bike racks, chainlink fencing, interpretive stormwater signage, LED sport court lighting, and planted stormwater management/LID features. Please see the plans and technical specifications for the additional information regarding the project scope This project is grant funded. Work must be completed and paid for by the District prior to June 30, 2024 Each bid must be accompanied by a Bid Guaranty in the form of a Certificate of Deposit, Certified or Cashiers Check, Bidders Bond or Irrevocable Standby Letter of Credit, in an amount equal to at least ten percent (10%) of the Bidders Grand Total Bid Price. The Bid Guaranty will be retained by District and applied to any and all damages sustained by District in the event that the successful Bidder fails or refuses to enter into the Agreement awarded to it and to furnish all required bonds and Certificates of Insurance District intends to award the Agreement to the lowest responsive, responsible Bidder based on the Base Bid Price. To the extent allowed by law, District reserves the right to reject any and all bids and/or to waive any irregularities or informalities in any bid or in the bidding procedure. District specifically reserves the right to not award the Agreement after the opening of bids. All questions prior to award of the Agreement shall be directed to the attention of the undersigned Contract Officer via fax at 916-428-7334 or email at vking@southgaterecandpark.net. Award anticipated 10/5

17 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects