Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 20, 2023

October 20, 2023

February 29, 2024

2305 Minnesota Blvd

Site Work

No Information to Display

$438,018.00

Public - State/Provincial

img_map_placeholder

2305 Minnesota Blvd, Saint Cloud, MN

Subscribe to View Full Documents

Site Directions: 2305 Minnesota Blvd, St Cloud, MN 56304 Est. Value Notes: 600000 Est. Completion Date: Feb. 29, 2024 A. The work will done under one prime contract. B. The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract. The Minnesota Office of IT Services (MNIT is requesting bids from vendors interested in providing compliant Data Network Cabling (Structured Cabling System) for Cisco wireless access points. Cabling and all associated equipment must be CAT6 Compliant. Cabling will be required to provide data to access points. Vendor will provide parts, materials, installation, and testing. A cabling map for each site is included in this Request for Bid. This solicitation includes qualification requirements. Attachment C of the Response Form contains the qualification requirements for the solicitation. Qualification requirements include, but are not limited to: Responding company has completed as a Prime Contractor, not as a subcontractor, the work for at least three (3) contracts which have achieved Substantial Completion since October 1, 2018, for construction of campus level fiber deployment and network cabling deployment. Each of these contracts MUST have had a construction value of $150,000 or greater. Question Deadline 09/08/2023 at 12:00 PM CT The pre-bid meeting is scheduled for Tuesday, September 5, 2023. a. Arrive at 7:30 AM for processing and check in. b. Site walkthrough 8:00 AM - 3:00 PM c. Check out 3:00 - 3:30 PM. d. Contractors must attend the entire walkthrough of the pre-bid meeting to be eligible to bid.

15 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.