Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
August 23, 2023
September 25, 2023
No Information to Display
Multiple Locations
Service, Maintenance and Supply
No Information to Display
No Information to Display
Public - City
Multiple Locations, Springfield, MO
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Poly Pipe: 1. Size 1 Inch Ips Sdr 9 2. Shall Meet the Requirements of the Latest Revision of Awwa C901/c906, Astm D2239, Astm D2737, Astm D3035, Astm F714 and Nsf Standard 61 Where Applicable. 3. Shall Be Labeled With Blue or White Lettering Containing at a Minimum the Manufacturers Name, Nominal Pipe Size, Sdr, Type of Material, Month and Year of Manufacture and the Plant Location Code. All Pipe to Have a Minimum of 3 Longitudinal Blue Stripes Oriented at 120 From Each Other. 4. Must Meet or Exceed Cell Classification 445574c Cc3 Per Astm D3350. 5. Pipe Shall Be Supplied in 500 Feet Coil. 6. Manufacture Date Must Be No More Than 24 Months Out Before Date of Delivery. 7. The Polyethylene Source Resin Shall Have a Ppi Tr-4 Independent Listing, and the Pipe Manufacturer Shall Maintain a Dependent Listing, Also in Conformance With Ppi Tr4. 8. All Rework, if Used, Shall Meet All Requirements of Awwa C901 or C906 Whichever is Applicable and Be Generated From the Same Manufacturing Facility as the Supplied Pipe. Rework Material Shall Not Exceed 10% of Material Used to Produce Pipe. 9. The Pe4710 Shall Be Well Processed to Maximize Homogenization to Minimize or Eliminate Un-pigmented Zones Across the Pipe Wall Cross-section. The Hdpe 4710 Pipe Shall Be Capaof Butt-fusion Across the Entire Range of Both Heater Plate Temperatures and Interfacial Press of Astm F2620. Fused Pipe Must Be Able to Pass a Mcelroy Side Bend Test. Mandrel Curvature to Specimen Thickness to Be 2:1 (R/t=2/1). 10. Pipe Shall Be Shipped With End Caps to Prevent Contamination During Shipping and Storage.
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Springfield, MO
Bid Date: Aug 24 2023
Springfield, MO
Bid Date: Jul 28 2023
Springfield, MO
Bid Date: Aug 30 2023
Springfield, MO
Bid Date: Aug 16 2023
Springfield, MO
Bid Date: Aug 17 2023
Springfield, MO
Bid Date: Oct 12 2023
Springfield, MO
Bid Date: Aug 17 2023
Springfield, MO
Bid Date: Dec 08 2022
Springfield, MO
Bid Date: Jun 22 2023
Springfield, MO
Bid Date: Aug 23 2023
Springfield, MO
Bid Date: Aug 22 2023
Springfield, MO
Bid Date: Jul 13 2023
Springfield, MO
Bid Date: Aug 29 2023
Springfield, MO
Bid Date: Jul 31 2023
Springfield, MO
Bid Date: Jul 25 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
