Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
September 7, 2023
October 9, 2023
No Information to Display
3333 Busch Rd
Renovation
No Information to Display
$100,000.00
Public - City
3333 Busch Rd, Pleasanton, CA
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
As of October 17, the project was awarded to Wilson General Contracting but the awarded amount is not available Reference Number 0000328279 The City of Pleasanton is seeking proposals from qualified contractors with experience in insulation application on a metal building roof. The City will review all proposals and select a contractor to enter into a mutual agreement for the Insulation Project of the Support Services Building for the Mechanic's Shop Area at the Operations Service Center (OSC) which is approximately 3000 square feet. Project Location: Operations Service Center (OSC) 3333 Busch Road, Pleasanton CA 94566 Support Services Building - Mechanic's Shop Area Question Acceptance Deadline 08/31/2023 at 5:00 PM PT Questions are submitted online No Questions should be directed to the Management Analyst, Daniel Villasenor by email at dvillasenor@cityofpleasantonca.gov Questions will only be answered by reference to a particular section of this bid document. *The City reserves the right to reject any or all bids and to determine which bid is, in the City's judgment, the lowest responsive and responsible bid of a Bidder or group of Bidders. Scope of Work and Project Location Installation: Install Rmax or equivalent 3.0" R value 20.3 Install Rmax insulation all throughout the mechanic shop secure all rigid insulation with L channel brackets, tape all sims with 3m foil tape metal roof ceiling, Approximately 3000 sq ft. Materials: Rmax thermasheath 3.0 or equivalent glue and sim tape fastening screws bracket straps to hold down insulation L channel bracket to support rigid insulation. Pad and Protection: Contractor needs to cover the work area, tools and vehicles with plastic and section off the identified area if needed. Remove and dispose of all trash on a daily basis. Contractor is responsible for hauling trash off-site each day
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Pleasanton, CA
Bid Date: Oct 17 2023
Pleasanton, CA
Bid Date: Mar 23 2021
Pleasanton, CA
Bid Date: Jan 12 2021
Pleasanton, CA
Bid Date: Jan 24 2024
Pleasanton, CA
Bid Date: Dec 20 2023
Pleasanton, CA
Bid Date: Sep 25 2024
Pleasanton, CA
--
Pleasanton, CA
Bid Date: Oct 23 2024
Pleasanton, CA
Bid Date: Jun 21 2023
Pleasanton, CA
Bid Date: Sep 06 2023
Pleasanton, CA
--
Ukiah, CA
Bid Date: Sep 19 2023
Bakersfield, CA
Bid Date: Sep 13 2023
Bakersfield, CA
Bid Date: Sep 13 2023
Hermosa Beach, CA
Bid Date: Sep 07 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
