Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 28, 2023

December 1, 2023

July 28, 2024

Henderson Circle to Craig Road

Paving, Site Work

No Information to Display

$2,347,179.00

Public - City

img_map_placeholder

Henderson Circle to Craig Road, North Las Vegas, NV

Subscribe to View Full Documents

The work to be performed under this Contract consist of furnishing of all labor, materials, material delivery, transportation and all associated services for the construction of the Commerce Street Rehabilitation and Commerce Street Streetlight (Project. This work generally consists removing existing asphaltic concrete pavement, curb and gutter, traffic striping. The construction includes roadway excavation, subbase, base course, asphalt pavement, sidewalk, sidewalk ramps with tactile warning panels, driveways, curb and gutter, traffic signs, pavement markings; loop detectors, illuminated street name signs, street lighting, pull boxes, conduit, and conductors; adjusting manholes, valves, pull boxes; traffic control; dust control; miscellaneous improvements as shown on the Drawings; and other related items of work as specified and shown on the drawings. All questions must be submitted in writing and received no later than 12:00 Noon on Tuesday, September 19, 2023. The Project shall be completed within 240 consecutive calendar days from the date specified in the Notice to Proceed, which time shall include resolution of all punch list items, final cleanup and demobilization. The estimated monetary range of the project is: $2,500,000 to $2,700,000. A Prebid Conference Will Not Be Held for This Project. The final 1% subcontractor list shall be included in the bid proposal or submitted via email within two hours of the bid opening. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. $2,500,000 to $2,700,000

14 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.