Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 4, 2023

October 4, 2023

No Information to Display

1 QC-219

Renovation

No Information to Display

$500,000.00

Public - Federal

img_map_placeholder

1 QC-219, Hemmingford, QC

We’ve obtained documents for this project and are currently processing them.

Subscribe to View Full Documents

Reference Number 0000253566 Question Acceptance Deadline Aug 31, 2023 02:00 PM EDT Pricing Lump sum Replace the disposal field and the septic tank. The equipment must remain in the same places so as not to conflict with the drinking water well on the site, while taking into account the limits of the property. It is important to meet state, federal and New York standards. The consultant must prepare an environmental mitigation measures form (FMA) with the preparation of the technical design program (PTC). Provide an allowance for soil characterizations. Also plan civil work and passage under Route 219. Plan a sequence of work so as not to interfere with building operations. An implementation plan should be planned or compensate for interruptions in health services. Provide for the development of a maintenance and monitoring plan for equipment and system parameters and define for which periodic verification must be carried out by an external firm competent in the field. The well identified in the TQCs has been plugged. See the one on the layout plan. The PTC must at least present 3 replacement options for the equipment covered by the project, and provide class D estimates, with advantages and disadvantages, for each option. Official bid documents must be obtained from www.bgis.merx.com and bid submissions must be done through the Merx platform.

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects