Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
September 15, 2023
November 15, 2023
April 11, 2024
US-84
Paving, Site Work
No Information to Display
$14,500,000.00
Public - State/Provincial
US-84, Abiquiu, NM
Termini: us 84, mp 198.658 to 199.252 for 0.594 miles County: rio arriba (district 5) Type of work: roadway reconstruction and rehabilitation, bridge rehabilitation Contract time: 100 working days Dbe goal: at this time nmdot will meet the state dbe on federally assisted projects through a combination of raceneutral and race-conscious measures. This project is subject to race-conscious measures. The established Dbe goal for this project is 0.00%. Licenses: (ga-1 or ga-98) and (gf-2 or gf-98) Funding type: federal-aid Listing threshold: none Wage rate (federal): nm20230037 Wage rate (state): type "A" (2023) As a condition to submitting a Bid all Bidders bidding as Contractors are required to be prequalified with the NMDOT's Office of Inspector General seven (7) Days before Bid Opening per 18.27.5 NMAC. All Subcontractors are required to be prequalified before performing any Work and prior to supplying goods or services to the Project. The Bidders prequalification factor rolling average will be applied to any Project with an engineers estimate greater than $5 million. All Bidders submitting Bids valued over sixty thousand dollars ($60,000.00) shall be registered with the Department of Workforce Solutions (DWS), Labor Relations before Bidding. The Bidder's registration number shall be included on the Bid Form. If a Bidder appears on the DWS list of willful violators of the Public Works Minimum Wage Act (NMSA 13-4-14), the NMDOT shall reject the Bid and shall continue to reject Bids from that Bidder for three years after the date of publication of the list. The Bidders Bid Guaranty shall be five percent (5%) of the Bidders Total Bid Amount and shall be submitted before Bid Opening through either Surety 2000 or Tinubu Surety. Failure of the Bidder to comply with this Advertisement shall render the Bid non-responsive and the Bid shall be rejected. NMDOT - 003 - Roadway Reconstruction/Rehabilitation, Bridge Rehabilitation
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Abiquiu, NM
Bid Date: Oct 19 2023
Abiquiu, NM
Bid Date: Jan 18 2024
Clovis, NM
Bid Date: Aug 17 2023
Socorro, NM
Bid Date: Jun 26 2023
Santa Fe, NM
Bid Date: Nov 02 2023
Gallup, NM
Bid Date: Aug 22 2023
Las Cruces, NM
Bid Date: Aug 22 2023
Aztec, NM
Bid Date: Sep 14 2023
Albuquerque, NM
Bid Date: Sep 21 2023
Santa Fe, NM
--
Las Cruces, NM
Bid Date: Sep 07 2023
Roswell, NM
Bid Date: Aug 29 2023
Santa Fe, NM
Bid Date: Aug 21 2023
Belen, NM
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
