Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 27, 2023

November 27, 2023

No Information to Display

To Be Determined

Renovation

No Information to Display

$6,000,000.00

Public - State/Provincial

img_map_placeholder

To Be Determined, Davis, CA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Construction includes the building of a Hospital Bed Replacement Tower (RHT). The RHT, also known as California Tower, is a key piece of UC Davis Healths strategy to achieve seismic safety compliance, additional service capacity, and operational improvements. The RHT project is envisioned to comprise a minimum of +/-332 inpatient beds including ICU and medical/surgical, Acuity Adaptable (ICU capable rooms), complex procedure rooms, and imaging and support services. The building option under consideration is approximately 909,000 BGSF of new space. The construction site is located on the east end of the existing hospital, adjacent to the Pavilion that houses primarily surgery, ICUs, the burn unit, and the emergency department. The RHT will be connected to the Pavilion. Utilities for the RHT will be supplied from the Central Utilities Plant. Work in this bid package includes Investigation and Construction Services for Mass Excavation and Dewatering. All work included in this advertisement will be performed under the authority and jurisdiction of HCAI. Submit a completed Prequalification Questionnaire with the required attachments on or before 2 p.m., August 29, 2023, per instructions in questionnaire An Approved for Permit Set Document package has been completed by the Design-Build Team and will be included with the Request for Proposals (RFP). The targeted completion date for the project is 2030. This scope of work to includes Construction Services to provide complete Mass Excavation and Dewatering scopes. The estimated Target Director Work Cost is $950,000,000. Of that overall Target Cost, the total budget for this bid package scope, in todays dollars, is $6,000,000. The Design Team is: McCarthy Building Companies, Inc. SmithGroup - Architect Siegfried - Civil Degenkolb - Structural Silverman & Light - Electrical The Engineering Enterprise & TEEcom - Low Voltage Mazzetti - Mechanical & Plumbing Coffman Engineering - Fire Protection

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.