Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
September 27, 2023
November 27, 2023
No Information to Display
To Be Determined
Renovation
No Information to Display
$6,000,000.00
Public - State/Provincial
To Be Determined, Davis, CA
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Construction includes the building of a Hospital Bed Replacement Tower (RHT). The RHT, also known as California Tower, is a key piece of UC Davis Healths strategy to achieve seismic safety compliance, additional service capacity, and operational improvements. The RHT project is envisioned to comprise a minimum of +/-332 inpatient beds including ICU and medical/surgical, Acuity Adaptable (ICU capable rooms), complex procedure rooms, and imaging and support services. The building option under consideration is approximately 909,000 BGSF of new space. The construction site is located on the east end of the existing hospital, adjacent to the Pavilion that houses primarily surgery, ICUs, the burn unit, and the emergency department. The RHT will be connected to the Pavilion. Utilities for the RHT will be supplied from the Central Utilities Plant. Work in this bid package includes Investigation and Construction Services for Mass Excavation and Dewatering. All work included in this advertisement will be performed under the authority and jurisdiction of HCAI. Submit a completed Prequalification Questionnaire with the required attachments on or before 2 p.m., August 29, 2023, per instructions in questionnaire An Approved for Permit Set Document package has been completed by the Design-Build Team and will be included with the Request for Proposals (RFP). The targeted completion date for the project is 2030. This scope of work to includes Construction Services to provide complete Mass Excavation and Dewatering scopes. The estimated Target Director Work Cost is $950,000,000. Of that overall Target Cost, the total budget for this bid package scope, in todays dollars, is $6,000,000. The Design Team is: McCarthy Building Companies, Inc. SmithGroup - Architect Siegfried - Civil Degenkolb - Structural Silverman & Light - Electrical The Engineering Enterprise & TEEcom - Low Voltage Mazzetti - Mechanical & Plumbing Coffman Engineering - Fire Protection
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Davis, CA
Bid Date: Aug 21 2023
Davis, CA
--
Davis, CA
Bid Date: Aug 09 2023
Davis, CA
Bid Date: Aug 15 2023
Davis, CA
Bid Date: Aug 03 2023
Santa Monica, CA
--
Los Banos, CA
Bid Date: Aug 31 2023
Ceres, CA
Bid Date: Sep 05 2023
Long Beach, CA
Bid Date: Oct 31 2023
Santa Cruz, CA
Bid Date: Aug 18 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
