Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 30, 2023

September 29, 2023

No Information to Display

To Be Determined

Paving, Site Work

No Information to Display

$600,000.00

Public - City

img_map_placeholder

To Be Determined, Wenatchee, WA

Our team is requesting plans for this project.

Subscribe to View Full Documents

*The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Est. Value Notes: $500,000 to $600,000 This project involves re-grading of the open areas on the existing Wenatchee Rescue Mission for pallet shelter placement and construction and placement of utilities, stormwater drainage and a pedestrian trail. Utilities required as part of this project includes the installation of four catch basins and a storm pipe system, water service connections, sewer connections and power.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.