Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 5, 2023

October 2, 2023

July 31, 2024

5990 S Val Vista Dr

New Construction, Site Work

No Information to Display

$4,000,000.00

Public - City

img_map_placeholder

5990 S Val Vista Dr, Chandler, AZ

We’ve obtained documents for this project and are currently processing them.

Subscribe to View Full Documents

The Chandler Unified School District is seeking qualified Construction Management at Risk firms (CM@Risk) to provide complete construction services including but not limited to design assistance, budget estimating, value engineering, scheduling and constructability analysis as required for the successful completion of the Basha High School Field House. The scope of work for the Basha High School Field House shall include, but not be limited to the following activities: Construction of a new 7,000 square-foot single story building. New building includes locker rooms, team room, coach's offices, training room, storage room, and associated equipment. Rerouting of existing utilities, as required. The CM@Risk general contractor shall be responsible for all off-site and on-site activities as required for new construction. The CM@Risk general contractor shall obtain all required permits from all governmental agencies including city, county, state and SRP. The estimated construction base bid budget is $4 Million. The School District and the General Contractor selected for the CM@R project agree to a zero dollar no cost pre-construction contract. All fees and services will be negotiated and agreed upon during the GMP negotiations but will not be considered pre-construction. The Basha High School Field House project will be designed by SPS+ Architects. For all questions and clarifications please see the question and answer tab of the solicitation located in the digital version of the Solicitation. All questions must be submitted no later than Friday, August 25, 2023 at 4:30 pm. The approximate Construction Schedule is as follows: Estimated Start Construction - October 2023 Estimated Completion - July 2024 Question Submission Deadline:August 25, 2023, 4:30pm

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.