Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 8, 2023

January 8, 2024

August 30, 2025

400 N Pepper Ave

Renovation

No Information to Display

$8,000,000.00

Public - County

img_map_placeholder

400 N Pepper Ave, Colton, CA

Subscribe to View Full Documents

Contractor shall provide all materials, labor, equipment, and undertake all efforts necessary or appropriate to construct the Project in accordance with the requirements of the Contract Documents, all governmental approvals, all Applicable Law, and all other applicable safety, environmental and other requirements taking into account the constraints affecting the Project Site. Construction estimate is $8,000,000. Pursuant to the provisions of Government Code Section 53069.85 and in the event that all the Work called for in this Contract is not completed within the number of calendar days set forth, Contractor shall forfeit and pay to the County the sum of $1,500 per day for each calendar day the work remains incomplete, to be deducted from any payments due or to become due to the Contractor The General Prevailing Wage Determination made by the Director of Industrial Relations pursuant to California Labor Code Part 7, Chapter 1, Article 2, Sections 1770, 1773 and 1773.1 are included in this Bid Package and must be complied with, as stated in Section 14 of the General Conditions. The undersigned hereby certifies that he is currently the holder of a valid State Contractors Class B license as a contractor in the State of California and that the license is the correct class of license for the work described in the project drawings and specifications The undersigned agrees to complete the work within 600 calendar days from the date stipulated in the Notice to Proceed. Question Deadline 10/26/2023 For information regarding this project, contact Nicholas Ho, Project Manager, at (626) 592-1734. DO NOT CONTACT THE DESIGN CONSULTANT. All technical questions to be submitted to the Project Manager in writing via email at nicholas.ho@pfm.sbcounty.gov. The undersigned agrees that the County reserves the right to reject any or all bids and reserves the right to waive informalities in a bid or bids, not affected by law, if to do so seems to best serve the public interest.

26 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.