Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 12, 2023

October 12, 2023

No Information to Display

Multiple Locations

Site Work

No Information to Display

$32,200.00

Public - City

img_map_placeholder

Multiple Locations, Arran, SK

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

The Rural Municipality of Livingston invites proposals from qualified bridge companies to remove and replace the railings on both sides of the Low-Level Bridge at: 51 52'57"N 101 50'19"W We are looking for 2 proposals, one for wood and one for steel. This is a standard 9m bridge (40') with room for 18 posts or posts and blocks. There is a serious water, ice and debris event every spring which usually plays havoc with the west side railings. The railings are kept lower than code because there is enough for debris and ice to get caught on and ruin the structure. This is a standard 9m bridge (40') with room for 18 posts or posts and blocks. There is a serious water, ice and debris event every spring which usually plays havoc with the west side railings. The railings are kept lower than code because there is enough for debris and ice to get caught on and ruin the structure. The successful bid will need to include: 1. Removing and disposing of the existing railings and blocks. 2. The new structure can consist of metal or wood. 3. Height of the Railings can be discussed with the administrator 4. There are 18 posts with 4 bolts, washers and nuts for each. If 8" posts and 8" blocks are used then then the standard 24" ready rod can be used in the original placements in the concrete girders. Questions regarding the RFP can be directed to the RM office at: 306-595-4521 or rm331@sasktel.net

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects