Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

February 21, 2024

No Information to Display

Multiple Locations

Service, Maintenance and Supply

No Information to Display

No Information to Display

Public - City

img_map_placeholder

Multiple Locations, Aberdeen, MS

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

The City of Aberdeen requests proposals from qualified firms or individuals to provide engineering services on an as needed basis for a project funded by the Mississippi Department of Environmental Quality American Rescue Plan Act: Mississippi Municipality and County Water Infrastructure Grant Program and/or other state and federal funds Selection of an engineer will be based on the criteria established in this Legal Advertisement. Engineer(s) shall not submit any cost or price information with their proposals. Engineer(s) should submit complete proposals sufficient for final selection of the most qualified engineer. The selected Engineer will provide all engineering services through project closeout in accordance with federal, state, and local laws, regulations, and policies. The scope of work may include, but is not limited to, the following: 1) planning services and/or guidance in selecting a project based on system needs; 2)preparation of plans and specifications; 3) distribution of bid documents and any addenda to such documents; 4) assistance in bid opening and preparation of bid tabulation; 5) assistance in the execution of construction contracts;6) holding pre-construction conference; 7) providing construction management services, including review/approval of payment applications, preparation of change orders, attendance at regular meetings with construction contractor, and performance of construction observation including periodic reports to the OWNER, and 8) assistance with project closeout. The final scope of work will be negotiated at the time of contract execution. The OWNER is an Equal Opportunity Employer. The OWNER encourages Minority-owned Business Enterprises (MBEs) and Women owner Business Enterprises(WBEs) to submit proposals. Based on the Assistance Listing: Coronavirus State and Local Fiscal Recovery Funds and Part 2 of the US Treasury State and Local Fiscal Recovery Funds Compliance and Reporting Guidance (v3.0 February2022) (Compliance Guide), the following Uniform Guidance provisions apply to the ARPA/CSLFRF grant award: o Subpart A, Acronyms and Definitions o Subpart B, General Provisions o Subpart C, Pre-Federal Award requirements and Contents of Federal Awards (except CFR200.204, .205, .210, and .213) o Subpart D, Post Federal; Award Requirements (except 2 CFR200.305 (b) (8) & (9), .308, .309,and .320(c)(4)) o Subpart E, Cost Principles o Subpart F, Audit Requirements o 2 CFR Part 25 (Universal Identifier & System for Award Management) o 2 CFR Part 170 (Reporting Sub award and Executive Compensation Information) o 2 CFR Part 180 (OMB Guidelines to Agencies on Government wide Debarment and Suspension (Non procurement) o Executed Contracts shall include provisions for Non-Federal Entity Contracts Under Federal Awards listed in Appendix II to Part 200 Qualifications-The qualifications of the firm and persons assigned to the project. Experience-The firm's experience and the projects previously undertaken, the project activities, and the status of the projects. Project Knowledge-Familiarity with the OWNER's infrastructure and regulator requirement of similar funding programs. The OWNER will designate a selection committee to evaluate each proposal. The selection committee may hold proposals for a period not to exceed thirty (30) days for the purpose of reviewing the content of the proposals and investigating the qualifications of the firms and assigned individuals. The OWNER reserves the right to reject any and/or all proposals. The OWNER will award a contract with the qualified individual or firm whose proposal has the highest number of cumulative points issued by the selection committee and determined to be the most advantageous to the OWNER, all factors considered. The contract will include the scope and extent of work and other essential requirements. The contract will be on a fixed price basis. The OWNER has the authority to terminate the selection at any time. The method of Contractor Selection has not been Determined at this time.

1 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects