Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 15, 2023

November 15, 2023

November 15, 2024

To Be Determined

Renovation

No Information to Display

$5,000,000.00

Public - Federal

img_map_placeholder

To Be Determined, Camp Lejeune, NC

Our team is requesting plans for this project.

Subscribe to View Full Documents

Only Mechanical MACC Contractors listed on the General Requirements cover page may submit a proposal for this ROICC Camp Lejeune area of responsibility project. See attached documents for scope of work and any applicable drawings. Title: Modify Generators and Wiring UN660 Contract Completion Date: 360 days after award Estimated Cost Range: Between $1,000,000 and $5,000,000 Wage Determination: General Decision Number: NC20230038 04/21/2023 Liquidated Damages: $880 per Calendar Day Notes: One person may fill the roles of Superintendent, Quality Control Manager, and Safety and Health Officer, if duly qualified for all three positions as defined in the project specification. Special Scheduling: Due to operations at Building 891, an outage lasting over 4 hours shall not be permitted. All shutdown work must be completed between 1000 and 1400 hours MondayFriday. Weekend shutdown work is not allowed. The exact time of shutdown must be coordinated with the building tenant and Contracting Officer. Basis for Award: Lowest Price This project is a straddle project. It may be awarded in the fourth quarter of fiscal year 2023 or the first quarter of fiscal year 2024. Proposal Acceptance Period: 90 days from receipt of offers Site Visit: TBD on amendment to follow. Bond Requirements: Bid bonds are required in accordance with FAR 53.301-24. An electronic copy of your bid bond may be submitted with your proposal. Failure to submit a bid bond by the deadline will result in your proposal being removed from consideration. Payment and/or performance bond(s) will be requested at the time of award per the current process. o No bonds are required for proposals less than $40K. o Proposals valued at $40K and greater will require a payment bond only. o Proposals valued at $150K and greater will require a bid bond, a payment bond, and a performance bond. Requests for Information (RFIs): RFIs must be submitted by the prime contractor to tony.d.benson.civ@us.navy.mil. The cut off for RFIs is Sept 1, 2023 by 2:00 PM EST in order to process all inquiries by the proposal due date. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects