Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 29, 2023

October 30, 2023

January 22, 2025

Multiple Locations

Renovation, Site Work

No Information to Display

$2,000,000.00

Public - City

img_map_placeholder

Multiple Locations, Salina, UT

Subscribe to View Full Documents

The Salina City Wastewater Improvements Project includes the replacement of approximately 44,000 feet of sewer main pipe with associated manholes, service stubs, and cleanouts. The project also includes upgrades to the existing lift station, and a new lagoon headhouse with screening, metering, and appurtenances. This project is funded by Community Impact Fund Board. The ENGINEER for this Contract will be Sunrise Engineering, Incorporated and they will be represented by Mario Gonzalez, P.E. as Project Engineer. Each BID must be accompanied by a BID BOND payable to the OWNER for five percent of the total amount of the BID. As soon as the BID prices have been compared, the OWNER will return the BONDS of all except the three lowest responsible, responsive BIDDERS. When the Agreement is executed, the bonds of the two remaining unsuccessful BIDDERS will be returned. The BID BOND of the successful BIDDER will be retained until the PAYMENT BOND and PERFORMANCE BOND have been executed and approved, after which it will be returned. A certified check may be used in lieu of a BID BOND. A PERFORMANCE BOND and a PAYMENT BOND, each in the amount of 100 percent of the CONTRACT PRICE, with a corporate surety approved by the OWNER, will be required for the faithful performance of the contract. BIDDER hereby agrees to commence WORK under this Contract on or before a date specified in the NOTICE TO PROCEED and to fully complete the CONTRACT within 450 consecutive calendar days thereafter. BIDDER further agrees to pay liquidated damages, the sum of $ 1,200, for each consecutive calendar day thereafter as provided in Section 15 of the GENERAL CONDITIONS. This BID will remain open for sixty (60) days after the date of the Bid Opening. If awarded the Contract, the BIDDER will sign the Agreement and submit the security and the other documents required by the CONTRACT within ten (10) days after the date of the OWNER'S "Notice of Award".

5 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.