Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

October 16, 2023

January 1, 2024

Multiple Locations

Service, Maintenance and Supply

No Information to Display

$36,000.00

Public - City

img_map_placeholder

Multiple Locations, Sleepy Hollow, NY

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

The Village of Sleepy Hollow seeks a qualified consultant to prepare an Engineering Planning Report focusing on the Village's sanitary sewer system, specifically the sewer main and manholes, in the following areas: On Clinton Street from Beekman Avenue to Cortlandt Street On College Street from Route 9 to Cortlandt Street. The Engineering Planning Report will investigate flow concerns, identify water quality issues, evaluate alternatives, and recommend a capital improvement project. The goal of the project is to identify areas in which there is storm water infiltration in the sanitary system in order to develop a plan to reduce or eliminate these connections. The consultant will inspect all sanitary sewer mains and manholes, and assess their internal conditions for necessary rehabilitation, recording them with precise location information. The consultant is expected to identify significant sources of inflow and infiltration, utilizing appropriate methods including but not limited to inspection of manholes and video analysis of sewer mains. Illicit connections to the sanitary sewer system will be documented. Your response should include the tools that will be employed, such as CCTV/video inspection, smoke testing etc. The project is funded in part by an Engineering Planning Grant through the NYS Environmental Facilities Corporation. Total project cost is estimated at $36,000. The Minority and Women Owned Business Enterprise goal is 30%. The Engineering Planning Report will comply with the New York State Environmental Facilities Corporation's requirements, found here, including the requisite format, information, discussion and analysis. Project completion is expected by January 1, 2024. All work shall be performed in accordance with the EFC's Mandatory State Financial Assistance Terms and Conditions (effective November 2, 2021). The method of Contractor Selection has not been Determined at this time. The Village of Sleepy Hollow retains the right to request further information from all respondents and to reject all responses at its sole discretion.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects