Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

December 5, 2023

January 5, 2024

No Information to Display

Lake Marie Blvd

Site Work

No Information to Display

$50,000.00

Public - City

img_map_placeholder

Lake Marie Blvd, Dundee, FL

Our team is requesting plans for this project.

Subscribe to View Full Documents

Contractor shall the furnish of all labor, materials, equipment, and supervision necessary to demolish, remove, haul away the existing bike trail bridge, and design and install 1 walk/bike trail bridge connecting the existing 5ft wide concrete sidewalk sections. This newly constructed bridge shall be constructed with aluminum material and adjustable to high or low water levels, and the newly constructed bridge shall be designed and constructed in accordance with any and all applicable ADA regulation(s)/requirement(s). Town staff is requesting to receive quotes on a 5ft x 50ft floating bridge with handrails on both sides either a straight or arched floating bridge with a gated opening in the center for any future additions to the floating bridge as shown in EXHIBIT "A" attached hereto and made a part hereof. Contractor shall be responsible for complying with applicable law, and Contractor shall submit all plans to the Town of Dundee for approval and permitting. The project is budgeted at $50,000.00. Questions may be submitted to the Town Clerk until 4:00 PM on Wednesday, November 22, 2023 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The Town of Dundee reserves the right to reject any and all bids, waive informalities, re advertise, and the Town of Dundee may enter into a contract determined, in the sole discretion of the Town of Dundee, to be in its best interest, in accordance with the Terms and Conditions referenced herein above

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.