Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

August 28, 2024

No Information to Display

FL-15

Paving, Site Work

No Information to Display

$3,950,000.00

Public - State/Provincial

img_map_placeholder

FL-15, Deland, FL

Our team is requesting plans for this project.

Subscribe to View Full Documents

Project Threshold : Project is greater than or equal to $500,000.00 (Technically Prequalified & Unlimited Audit required) District : 05 Selection Method : Letter of Response and Oral Presentation Project Description : Sr 15/600 (US 17/92) Plain Language Description : SR 15/600 (US 17/92) From St Johns River Bridge to N of Saxon Blvd; SR 15/600 (US 17/92) From N of Saxon Blvd to N of Wisconsin Ave 450973-1 is a resurfacing project with limits from begin MP 0.000 to end MP 5.304 for a project length of 5.238 miles. 450991-1 is a resurfacing project with limits from begin MP 5.304 to end MP 8.577 for a project length of 3.274 miles. The purpose of the projects is to resurface the existing pavement, rehabilitate the roadway sections that are in distress, and restore the final surface on SR-15 from St Johns River Bridge to North of Saxon Blvd and from North of Saxon Blvd to North of Wisconsin Ave. Other objectives for these projects include improving corridor safety by implementing speed management measures and pedestrian features. The projects will be let together as a "goes-with" and are funded for construction with a letting date of 1/28/2026. Number of contracts that may be awarded from this advertisement : 1 Advertisement Date 8/15/2023 Response Deadline Date/Time 8/29/2023 02:30 am Shortlist Selection Date/Time 9/18/2023 07:00 pm Technical Review Committee Meeting 1 Date/Time 10/03/2023 07:00 pm Technical Review Committee Meeting 2 Date/Time 10/03/2023 09:45 pm Technical Review Committee Meeting 3 Date/Time 10/04/2023 01:00 am Oral Presentation Date/Time 10/04/2023 Final Selection Date/Time 10/16/2023 07:00 pm Negotiations Period Begin Date 10/28/2023 Negotiations Period Ending Date 11/21/2023 The method of contractor selection has not been determined at this time. FDOT - RFP Engineering - Sr 15/600 (Us 17/92)

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.