Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
August 30, 2023
September 29, 2023
December 15, 2023
To Be Determined
Paving, Site Work
No Information to Display
$925,000.00
Public - County
To Be Determined, Clear Lake, IA
Main Open Ditch Repair Joint Drainage District No. 113- 123 & Drainage District No. 16 Cerro Gordo and Hancock Counties, Iowa Time and Place for Filing Sealed Proposals. Bid Security. Each bidder shall accompany its bid with bid security, as defined in Section 468.35 of the Iowa Code in the amount equal to five percent of the total amount of the bid.Contract Documents The Joint Drainage District Trustees reserves the right to reject any and all bids. Time for Commencement and Completion of Work. Work on the Repair shall commence upon approval of the contract by the Joint Trustees, and as stated in the Notice to Proceed. All work under the Contract must be substantially complete on or before December 15, 2023. Damages in the amount of $500.00 per day will be assessed for each day the work remains incomplete. Bid Security. Each bidder shall accompany its bid with bid security, as defined in Section 468.35 of the Iowa Code in the amount equal to five percent of the total amount of the bid. Preference of Products and Labor. Preference shall be given to domestic construction materials by the contractor, subcontractors, material, men, and suppliers in performance of the contract and further, by virtue of statutory authority, preference will be given to products and provisions grown and coal produced within the State of Iowa, and to Iowa domestic labor, to the extent lawfully required under Iowa statutes. Failure to submit a fully completed Bidder Status Form with the bid may result in the bid being deemed nonresponsive and rejected. Sales Tax Exemption Certificates. The bidder shall not include sales tax in the bid. The County Auditor will distribute tax exemption certificates and authorization letters. to the Contractor and all subcontractors who are identified. The Contractor and subcontractor may make copies of the tax exemption certificates and provide a copy to each supplier providing construction materials. These tax exemption certificates and authorization letters are applicable only for this specific project under the Contract. Payment for work done will be in accordance with estimates approved monthly by the Engineer and in Drainage Warrants issued by the Drainage District, which, if registered and stamped "not paid for want of funds ", shall bear interest at a rate fixed by the Trustees not to exceed the maximum set by law in accordance with Chapter 468 of the Code of Iowa, as amended. The Trustees reserves the right to issue Drainage District Improvement Certificates pursuant to Chapter 468 of the Code of Iowa, as amended, which certificates may be given in exchange for outstanding warrants issued to the Contractor or to the holder thereof. Said warrants to be surrendered, if called by the Trustees, in exchange for Drainage District Improvement Certificates which shall be taken by the Contractor or holder at par and shall bear interest at a rate fixed by the Trustees not to exceed the maximum set by law in accordance with Chapter 468 of the Code of Iowa, as amended. Progress payments will be made in an amount equal to ninety percent (90%) of the work completed. Final payment will be made not less than thirty (30) days after completion of the work and acceptance by the Board, subject to the conditions and in accordance with the provisions of Chapter 468 of the Code of Iowa, as amended. PROJECT DESCRIPTION: This project consists of construction of 18.4 stations of open ditch excavation, 18.4 stations of spoil bank leveling, 18.4 stations of open ditch seeding and fertilizing, clearing and grubbing, rip rap placement, repairs to surface drainpipes and tile extension pipes, and all other miscellaneous items relates thereto. The Joint Board of Supervisors acting as Trustees will select any or no bid that is in the best interest of the joint drainage district. All bidders will be required to complete each division of the "Proposal, Attachment C, Bid Items and Quantities" (including all alternate options) to be considered for award. Bidders must bid on all Divisions. The Joint Board of Supervisors as Trustees will select any combination of Divisions, which is in the best interest of the drainage district. Iowa.
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Clear Lake, IA
Bid Date: Oct 13 2023
Clear Lake, IA
Bid Date: Aug 28 2019
Clear Lake, IA
Bid Date: Oct 15 2024
Clear Lake, IA
Bid Date: Oct 01 2024
Clear Lake, IA
Bid Date: Aug 15 2023
Bettendorf, IA
Bid Date: Oct 18 2024
Missouri Valley, IA
Bid Date: Sep 05 2023
Central City, IA
Bid Date: Sep 14 2023
Hopkinton, IA
Bid Date: Sep 14 2023
Newton, IA
Bid Date: Sep 07 2023
Marshalltown, IA
Bid Date: Sep 19 2023
Waverly, IA
Bid Date: Sep 19 2023
Melbourne, IA
Bid Date: Sep 19 2023
Brooklyn, IA
Bid Date: Sep 14 2023
Cedar Rapids, IA
Bid Date: Sep 07 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
