Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 8, 2023

January 8, 2024

No Information to Display

2800 N. El Paso Road, Flagstaff, Arizona

Service, Maintenance and Supply

No Information to Display

No Information to Display

Public - City

img_map_placeholder

2800 N. El Paso Road, Flagstaff, Arizona, Flagstaff, AZ

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

The Owner invites interested Contractors with demonstrated experience with wastewater treatment and process construction projects, to submit a written SOQ presenting their qualifications to conduct CMAR Design Phase Services and Construction Phase Services required to assist the Design Professional to develop construction documents for the Project and subsequently perform the construction, start-up, and commissioning of the Project. Wherever the word "Contractor" is used in this RSOQ, it will mean each or any Contractors, Contractors, Partnerships, or Corporations, submitting a SOQ for CMAR Design Phase Services and Construction Phase Services being sought by the Owner for this Project. The Project is located within the boundaries of the Wildcat Hill Water Reclamation Plant (WHWRP) Digester Complex located at 2800 N. El Paso Road, Flagstaff, Arizona and can generally be described as construction of one (1) new conventional mesophilic anaerobic digester (CMAD), a new central digester control building, electrical building, digester gas scrubbing, odor control units, site piping, electrical, instrumentation and SCADA improvements and supporting facilities and appurtenances (for pumping, heating, and mixing) to address the City's needs for additional solids treatment and stabilization capacity and rehabilitation of the two (2) existing anaerobic digesters. The rehabilitation of the two (2) existing digesters may be eliminated due to budget constraints. The Contractor will also be required to construct connections to the existing thickening process (thickened sludge pumps) and grease systems. The Project is currently at 30% design, and in general, the Project consists of construction and installation of the following: 1. Primary Sludge and Waste Activated Sludge Mixing Box 2. Submersible Sludge Pumps 3. Digester Control Building 4. Anaerobic Digester 5. Polymer Feed Units 6. Digester Recirculation Pumps 7. Steam Generator 8. Dewatered Sludge Pumps 9. Odor Control Units 10. Digester Gas Scrubber 11. Yard Piping and Electrical Support 12. Site Grading and Paving Additionally, this Project includes coordination of natural gas lines that are installed within the site and connections to it.

1 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects