Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

March 6, 2024

January 3, 2029

5800 Mountain View Blvd

Service, Maintenance and Supply

No Information to Display

No Information to Display

Public - State/Provincial

img_map_placeholder

5800 Mountain View Blvd, Delta, BC

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

The Project will be located on a greenfield site owned by Fraser Health immediately adjacent to the Delta Hospital in the community of Ladner, in Delta, BC. Fraser Health approved a High Level Master Plan for the Delta Hospital campus site in 2012 which included the replacement of the Mountain View Manor care home. The Project will include replacement of the existing ninety-two (92) bed Mountain View Manor with a two hundred (200) single bed long-term care home which includes a Day Program for Older Adults (DPOA) for up to 32 clients and a stand-alone Child Daycare Space for up to 49 children, support services areas for food services, housekeeping, linen and laundry services, and washing equipment. Common areas include dining rooms, activity areas for programs, staff offices and support areas, and outdoor covered walkways and gardens. There are also transportation interfaces such as loading facilities, parking for staff, visitors, and HandyDART (the Project). The total area of the Project is estimated to be 15,328 m2. Fraser Health is taking a regional and portfolio approach to redevelopment of its existing long-term care homes and has developed a regional clinical plan and functional program for both long-term care and the DPOAs. The Project scope also includes a forty nine (49) space Child Daycare with a gross building floor area of approximately 750 m2. The successful Proponent is required to ensure that they will have sufficient capacity, dedicated manpower and resources to undertake the Project and deliverables to meet the schedule. Project duration is estimated at 55 months with a start date April 2023. The method of Contractor Selection has not been Determined at this time.

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.