Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 13, 2023

October 13, 2023

July 12, 2024

To Be Determined

Site Work

No Information to Display

$281,000.00

Public - State/Provincial

img_map_placeholder

To Be Determined, Boston, MA

Subscribe to View Full Documents

Charlesgate Park Wall Removal: Deconstruction, disposal, and restoration work, non-structural granite-faced reinforced concrete wall(s) positioned below the Bowker Overpass in Charlesgate Park in Boston, MA. Proposed work generally includes removing the wall(s) down to the top of buried pile caps, pouring concrete caps, backfilling the displaced volume, restoring the impacted surfaces, and restoring the bridge drain pipes and associate incidental work. The project includes a Base Bid and one Additional Bid Alternative. Generally, the Base Bid includes work associated with removal of the North Wall, and the Additional Bid Alternative include work associated with removal of the South Wall.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.