Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 18, 2023

November 17, 2023

September 22, 2026

8499 Forest Hill Blvd

Renovation

No Information to Display

$4,827,360.00

Public - County

img_map_placeholder

8499 Forest Hill Blvd, Wellington, FL

Our team is requesting plans for this project.

Subscribe to View Full Documents

The School Board of Palm Beach County, Florida Invites Certified General Contractors or Certified Building Contractors Prequalified by the School Board, Pursuant to Sref Chapter 4.1 Prior to the Proposal Due Date, to Submit a Proposal for: Construction Management Services for: Facility Renovations and Repairs Project Name: Palm Beach Central High School Project Address: 8499 W Forest Hill Blvd Wellington, Fl 33411 Construction Schedule : Design Notice to Proceed ....................................................november 17, 2023 Permitted Construction Documents ..............................september 11, 2024 Gmp Board Approval ...............................................................january 22, 2025 Substantial Completion ......................................................june 26, 2026 Selection Committee Meeting*: September 27, 2023 at 9:00 a.m., Est Scheduled Award of Contract: December 13, 2023 Q & A deadline: Sep 05, 2023 2:00:00 PM EDT Description: The Construction Manager Shall Provide All Preconstruction Phase Services Necessary to Establish a Gmp as Well as All Construction Phase Services Following Award of the Gmp for Each School Identified in This Project Notification. The Construction Manager May Be Required to Complete Portions of the Construction on an Occupied Campus as Directed by the Owner. The Construction Manager Shall Provide Deferred Maintenance, Renovation and Repairs to School Facilities Including, but Not Limited to, Ada and Csir Compliance Requirements; the Renovation and Repair of Building Envelope Items Such as Exterior Doors, Stucco Finish, Gutters and Downspouts, and Water Intrusion/waterproofing Applications; Signage; Fire Alarm/panel Upgrade and Fire Alarm/smoke and Duct Detector Replacement; Sheet Metal Ductwork/outside Air Dampers; Gym Floor-refinishing; Athletic Lighting; Bleacher Repairs; Boiler Replacement; Parking Lot Paving/striping; Playground Improvements; Outside Area Scoreboards Replacement; Vinyl Flooring; Plumbing Work Related to the Drinking Water Fountains, Bathroom Replacement and Water and Sewer Lines; Roof Repairs and Other Work as May Be Required. Construction Shall Incorporate All of the Requirements Set Forth in the Permitted Construction Documents, School District of Palm Beach County Master Specifications, District Design Criteria, State Requirements for Educational Facilities (Sref) 2014, Florida Administrative Code (Fac) Chapter 6a-2 and Florida Building Code. The Construction Manager Shall Prepare All Project Documents in Accordance With the Requirements Stated in Department of Education's Chapter 6a-2, Sref and Fac.

1 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects